TOBO GROUP TOBO International Trading (Shanghai) Co.,Ltd
|
Price: | 1.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shanghai, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Material: carbon&stainless&alloy steel
Technics: casting&forged
Type: Tee
Place of Origin: Shanghai, China (Mainland)
Model Number: tee
Brand Name: TOBO Group
Connection: BW&SW&TH
Shape: Equal&reducing
Head Code: Bevelled Ends&Plain Ends
tee: lateral tee
Packaging Details:Delivery Detail:
Wooden cases, pallets, nylon bags or according to the customers' requirements |
10-60 days |
Y tee
1.ASTM A234,A860,A694,A420,A105
2.Carbon steel,alloy steel,stainless steel
3 sizes are available
Tee Type | Equal tee, reducing tee,lateral tee, BW/butt weld tee, TH/threaded tee, SW/socket weld tee, seamless tee |
Standard | ASTM B16.9, ASTM B16.11, ASTM B16.5; JIS B2311,JIS B2312,JIS B2313,JIS B2316; MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79; ISO 3419,ISO 5251,DIN 2615 SY/T 0510, SH 3408, SH3410 |
Size | 1/2''-48''(Butt-welding and seamless);1/8''-4''(Threaded and socket-welding);16''~72''(Welded) |
Wall thickness | Sch5~Sch160\XXS |
Manufacturing process | Push, Press, Forge, Cast, etc. |
Material
Carbon steel Stainless steel Alloy steel Duplex steel Nickel alloy steel | Carbon steel tee, stainless steel tee, alloy steel tee |
ASTM A234 WPB, ASTM A420 WPL6, WPL3; ASTM A105 WPB; ASTM A106; ASTM A350 LF2, DIN St37, St45.8, St52.4,St.35.8,St.35.8/I ASTM A333 GR.6, ASTM A860 WPHY 70, WPHY 65, WPHY 60, WPHY 52,WPHY 46,WPHY 42, API 5L GRB, X60, X65, X42,X52, | |
ASTM A403 WP304, A403 WP304L, A403 WP316, A403 WP316L, A403 WP321 ASTM A182 F 304, 304L,316, 316L,904L | |
ASTM A234 WP12, A234 WP11, A234 WP22, A234 WP5, A234 WP9 A420 WPL8, A420 WPL9 ASTM A335 P5, P9, P11, P12, P22, P91 ASTM A213 ASTM A182 F5,F11,F22,F91 | |
ASTM A182 F51/SAF 2205/S31803,F53/SAF 2507/S32750,F60/UNS S32205, | |
Alloy 200/nickel 200/UNS S2200,Alloy 400/monel 400/UNS 4400,Alloy 600/Inconel 600/UNS, 6600,Alloy 201/nickel 201/UNS S2201,Alloy 625/Inconel 625/UNS 6625/NS336,Alloy 800/Incoloy 800/UNS S8800, | |
Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
MOQ | 1pcs |
Delivery time | 10-100 days depending on quantity |
Payment terms | T/T |
Shipment | FOB Tianjin/Shanghai, CFR, CIF, etc |
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Remarks | Other materials and drawings are available. |
|